![]() | ![]() | ![]() | ![]() |
|
|||
Other Transport Assessment aspects | |||
| Transport Home | Photography Home | Last updated - March 2015 |
|
|
Pages in this series |
Other aspects of transport assessments - Summary This page contains comments on various apsects of reviewing Transport Assessments not found on other pages. It currently includes
| ||
|
Calculating what traffic already exists All proposed developments will be replacing something else, and that something else may have traffic associated with it. For green fields and long derelict land, this will be zero or neglibible so can be ignored. But for many it's important to know how much traffic the current development generates, since the new development will be replacing that. In addition for some aspects of a TA it may be relevant that some land use has been used in the past, but not at the moment (see the next section on calculating what traffic did exist but not any more). Calculating what traffic did exist, but not any more (extant) For the purposes of calculating how much 'compensation' developers should pay to Local Authorities to mitigate the traffic impact of a development (Section 106 payments), the relevant figures for traffic that 'currently' exists includes traffic for which planning consent exists. Thus if an empty office block is being replaced by something else, then it's important to know how much traffic one would expect the offices to produce, were they full. The usual way to do this is to do 'Trics' traffic generation runs for the current development and use those, but some issues need to be borne in mind, namely whether the trip rate assumptions are right, and how long it's been unused with respect to how much should be paid, and more importantly whether it can really be argued that that traffic is relevant to increased traffic flows:
https://www.tfl.gov.uk/info-for/urban-planning-and-construction/transport-assessment-guidance (The counter to phantom traffic - ease of changing landuses) If a TA argues that there is permission for vacant areas of the site, then it should also admit that landuses can be changed. If permission is granted for "A1" retail then it can be any A1 land use. An application for furniture stores (which have low trip rates) could be changed to food stores (which have very much higher trip rates). A1 (retail) can also be changed to A2 (financial and professional) and there are other changes possible, but the main one to think about is in the wide ranges (A1) retail. Funnily enough I've never seen a TA that uses that argument!
But similarly housing can be applied for as a low generating class (such as rented flats), but then change to owner occupier which has higher rates. Or from private houses converted into flats.
Predicting how traffic increases will impact on junctions This is really techie stuff. More may be added on this in the future, but in the meantime it's worth reading "Transport Assessment Health Warning" by Barbara Chard (Traffic Engineering and Control, 2008) for likely errors in delay forecasting at junctions and the likely associated hidden costs to Local Authorities for not thoroughly checking these modelling aspects. Travel Plans Travel Plans are statements of intent which usually aim to show how people's travel behaviour will be changed so that fewer users of a site will arrive by car than the forecast suggests. They are not restricted to being a part of a TA, and have been written for facilities such as hospitals and some large offices since the early to mid 1990s. Besides as adjuncts to a TA they are generally written either where an organisation wants to use its land more efficiently, or when government suggests that they should be done (e.g. for hospitals about 15 years ago). For TAs the aim will usually be to show reduced expected travel by car, or to show that a car park will not be used to capacity. Guidance states that all TAs for large developments should incorporate a Travel Plan. On the face of it Travel Plans are pretty straightforward and understandable documents but many contain unrealistic statements which may make it seem that traffic will be far less than is likely. Elements used in Travel Plans Travel Plans can include a number of proposed measures, such as:
It's generally reckoned that for a Travel Plan to be effective it needs to include both carrot and stick measures and to be continually monitored. Many offered with TAs tend to be somewhat optimistic, such as suggesting that information on public transport will do the trick. But some organisations treat them seriously, knowing that they can actually save money by reducing the need for car parking and so using their land more intensively. And "Active Travel" (walking and cycling, or even bus use as it involves a walk) is known to have major health benefits to society and the health service. At what level does traffic congestion become "severe"? The National Planning Policy Framework suggests that a development should be allowed (on traffic grounds) if the impacts are not severe, but then makes no attempt to guide readers as what 'severe' means. Even if a TA is 'tested' by appeal then what was deemed severe (or not) by a planning inspector would probably not provide a precedent for many other proposed developments. Some points are worth making.
| |||
|
| |||
|
The next page is a brief look at
transport in Environmental Impact Statements
|
Gordon Stokes, 2015 |
||